New home slabs · Sydney

House Slabs Sydney

A house slab has to be set out accurately, steel fixed to the engineer's drawings, and poured to Australian Standard. There is no room to correct it afterwards — everything above it is built off those dimensions.

We work from the engineering drawings supplied with the build, and pump where the truck cannot reach the pad.

32MPa

20mm aggregate

S72

Mesh, on chairs

AS

Australian Standard

Step 1 of 4 · Job

What do you need poured?

Select as many as apply.

Four quick steps. Viliami will contact you directly.

What a quote covers

House Slabs — what's included

Every quote is itemised, so you can see what the concrete, the reinforcement and the labour each cost rather than a single figure.

Request a Quote
  • Site levelling and base preparation
  • Formwork and set out to the engineering drawings
  • Steel fixing to specification, on chairs
  • Plumbing penetrations set before the pour
  • Concrete pump where access requires it
  • 32MPa concrete at 20mm aggregate
  • Screed, float and finish
  • Saw cutting where specified

Worth knowing

How we approach house slabs

Set out is checked before the steel goes in

Dimensions are confirmed against the drawings at formwork stage. A slab that is out at set-out stays out for the life of the building.

Pumped where access is tight

On a battleaxe block or a narrow frontage the truck cannot reach the pad. A pump is included in the quote rather than raised as a variation on the day.

How a project runs

Seven stages

The sequence is the same on every project we quote, house slabs included.

  1. 01

    Demolition and excavation

    Existing slab removed, ground opened up and a skip brought on site. Spoil is carted away rather than left at the frontage.

  2. 02

    Levelling and base

    Base graded and compacted. No quantity of concrete corrects a poorly prepared subgrade.

  3. 03

    Formwork

    Boxed and pegged to finished levels, with falls set so water drains away from the building.

  4. 04

    Steel fixing

    S72 reinforcing mesh raised on plastic chairs so it sits within the slab, with abelflex to the perimeter.

  5. 05

    The pour

    32MPa at 20mm aggregate, pumped where access requires it. Driveways are poured at 130mm.

  6. 06

    Finishing

    Screeded, floated and hand finished while the concrete is still green.

  7. 07

    Saw cutting

    Cut early to control where the slab relieves. Every slab moves; the cuts determine where.

Request a quote

House Slabs across Sydney

Based in Seven Hills and working across all of Sydney. Quotes are itemised and hold for 60 days. Viliami will contact you directly.