Recent projects · Sydney

Our work

Every photograph below is our own work, taken on site. Where a shot is mid-build rather than finished, the caption says so — you are seeing the job as it actually ran.

Footpath to the streetFrontage completed
Frontage reinforcedMesh laid, ready to pour
Side access, finishedNew build, hand finished
Curved rear pathSet out by hand
Narrow side accessHand finished
Side path, completedWall protected during pour
S72 mesh on chairsSide access, before the pour
Rear path, ready to pourFormwork, S72 mesh and abelflex
Drainage at the cornerResolved before the pour
Side access excavatedBase course down
Excavation underwayDay one
Path beside the houseCompleted, taped off to cure
Side path reinforcedMesh laid, before the pour
Slab with penetrations setPlumbing in before the pour
Rear slab set outFormwork and mesh, before the pour

One job, start to finish

How a job actually runs

Every frame below is the same job at the same address, photographed across six days — a wraparound path on a new build in Sydney's south west.

  1. Excavation — Ground opened up, formwork timber on siteDay 1

    Excavation

    Ground opened up, formwork timber on site

  2. Formwork — Curve around the lawn set out by handDay 2

    Formwork

    Curve around the lawn set out by hand

  3. Steel fixed — S72 mesh raised on plastic chairsDay 3

    Steel fixed

    S72 mesh raised on plastic chairs

  4. Poured — Finished and taped off to cureDay 4

    Poured

    Finished and taped off to cure

  5. Complete — Wraparound path, new buildDay 6

    Complete

    Wraparound path, new build

Request a quote

Want something like this?

Tell us what you need poured and Viliami will contact you directly. Quotes are itemised and hold for 60 days.

Prefer to speak with someone?

Call 0448 035 058

Step 1 of 4 · Job

What do you need poured?

Select as many as apply.

Four quick steps. Viliami will contact you directly.

CallRequest a Quote