Secondary dwelling slabs · Sydney

Granny Flat Slabs Sydney

A granny flat slab is a house slab on a smaller footprint, usually in a rear yard with restricted access. The two things that decide how it goes are access for the concrete and getting the plumbing penetrations in the right place before the pour.

Both get resolved at quoting stage rather than on the day.

32MPa

20mm aggregate

S72

Mesh, on chairs

AS

Australian Standard

Step 1 of 4 · Job

What do you need poured?

Select as many as apply.

Four quick steps. Viliami will contact you directly.

What a quote covers

Granny Flat Slabs — what's included

Every quote is itemised, so you can see what the concrete, the reinforcement and the labour each cost rather than a single figure.

Request a Quote
  • Site levelling and base preparation
  • Formwork and set out
  • Plumbing penetrations positioned before the pour
  • Steel fixing on chairs, abelflex to the perimeter
  • Concrete pump for rear yard access
  • 32MPa concrete at 20mm aggregate
  • Finishing and saw cutting
  • Spoil carted away

Worth knowing

How we approach granny flat slabs

Penetrations set, not cut in later

Waste and water penetrations are positioned and boxed before the concrete goes down. Coring them afterwards means cutting through the reinforcement.

Rear yard access is priced in

Most granny flat slabs sit behind an existing house. The pump, and getting the spoil back out through a side gate, are in the quote from the start.

How a project runs

Seven stages

The sequence is the same on every project we quote, granny flat slabs included.

  1. 01

    Demolition and excavation

    Existing slab removed, ground opened up and a skip brought on site. Spoil is carted away rather than left at the frontage.

  2. 02

    Levelling and base

    Base graded and compacted. No quantity of concrete corrects a poorly prepared subgrade.

  3. 03

    Formwork

    Boxed and pegged to finished levels, with falls set so water drains away from the building.

  4. 04

    Steel fixing

    S72 reinforcing mesh raised on plastic chairs so it sits within the slab, with abelflex to the perimeter.

  5. 05

    The pour

    32MPa at 20mm aggregate, pumped where access requires it. Driveways are poured at 130mm.

  6. 06

    Finishing

    Screeded, floated and hand finished while the concrete is still green.

  7. 07

    Saw cutting

    Cut early to control where the slab relieves. Every slab moves; the cuts determine where.

Request a quote

Granny Flat Slabs across Sydney

Based in Seven Hills and working across all of Sydney. Quotes are itemised and hold for 60 days. Viliami will contact you directly.

Prefer to speak with someone?

Call 0448 035 058

Step 1 of 4 · Job

What do you need poured?

Select as many as apply.

Four quick steps. Viliami will contact you directly.

CallRequest a Quote