The crossover is the section between the kerb and your boundary. It is council land, it has to be built to their specification, and it usually has drainage running through it that needs resolving before anything is poured.

It is worth doing the crossover and the driveway together. Done separately you end up with two pours meeting at the boundary at slightly different levels, and a lip you feel every time you drive over it.

130mm

Poured depth

32MPa

20mm aggregate

S72

Mesh, on chairs

Step 1 of 4 · Job

What do you need poured?

Select as many as apply.

Four quick steps. Viliami will contact you directly.

What a quote covers

Crossovers — what's included

Every quote is itemised, so you can see what the concrete, the reinforcement and the labour each cost rather than a single figure.

Request a Quote
  • Demolition of the existing crossover and layback
  • Excavation and cart-away
  • Skip bin on site
  • New drainage where required
  • Formwork to council levels
  • Steel fixing — S72 mesh on chairs
  • 32MPa concrete at 20mm aggregate
  • Finishing and saw cutting
  • Rubbish removal

Worth knowing

How we approach crossovers

Levels have to match at the boundary

The crossover meets your driveway at the property line. Pouring both together is the only reliable way to get that junction flush rather than stepped.

Drainage gets resolved first

Stormwater and kerb drainage run through this section. It is sorted at excavation, because the alternative is breaking up new concrete to reach it.

How a project runs

Seven stages

The sequence is the same on every project we quote, crossovers included.

  1. 01

    Demolition and excavation

    Existing slab removed, ground opened up and a skip brought on site. Spoil is carted away rather than left at the frontage.

  2. 02

    Levelling and base

    Base graded and compacted. No quantity of concrete corrects a poorly prepared subgrade.

  3. 03

    Formwork

    Boxed and pegged to finished levels, with falls set so water drains away from the building.

  4. 04

    Steel fixing

    S72 reinforcing mesh raised on plastic chairs so it sits within the slab, with abelflex to the perimeter.

  5. 05

    The pour

    32MPa at 20mm aggregate, pumped where access requires it. Driveways are poured at 130mm.

  6. 06

    Finishing

    Screeded, floated and hand finished while the concrete is still green.

  7. 07

    Saw cutting

    Cut early to control where the slab relieves. Every slab moves; the cuts determine where.

Request a quote

Crossovers across Sydney

Based in Seven Hills and working across all of Sydney. Quotes are itemised and hold for 60 days. Viliami will contact you directly.

Prefer to speak with someone?

Call 0448 035 058

Step 1 of 4 · Job

What do you need poured?

Select as many as apply.

Four quick steps. Viliami will contact you directly.

CallRequest a Quote